Skip to content

Cart

Your cart is empty

Avira Lighting

Peak Cap Reference

Find the slope, pick your path, set the saw. For a light dead center at the peak.

31.0°slope · about 7/12
PATH A perpendicular · on the jig

Example loaded: a 31° roof. Type your own reading. Every dial is counted from square (0°).

Step 1Find the slope

Speed square + level

slopelevel

Always reads from level.

Slope = the reading

Digital gauge

0.0°from level ✓90.0°from vertical ✗

Set it flat on something level first. 0.0 means it reads from level. 90.0 means it reads from vertical.

0.0: slope = reading
90.0: slope = 90 − reading

Johnson across the peak

apex

Measures the whole peak (apex). Over 180°? Apex = 360 − reading first.

Slope = (180 − apex) ÷ 2

Gut check

Houses run 18° to 45°. A reading over 45° on a normal-looking roof means the gauge read from vertical: use 90 − reading.

35° · normal house55° · very steep
Same width, two slopes. Look up at the house: which one is it?

Step 2Pick your path

Path A · perpendicular, on the jig

FENCEJIG

Slope under 45°. Most roofs.

Path B · parallel, along the fence

FENCE

Slope 45° or more. Steep roofs.

Why the split: along the fence the saw has to tilt to 90 − slope. On a 31° roof that’s 59°, past most saws, so it goes on the jig.

FENCEribbed edgesquare = dial 0°slope 31°dial 59°= 90 − slopeRibbed edge ALONG the fence (Path B · parallel)FENCEsquare = dial 0°4×4 JIGribbed edgedial 31°= slope(square and ribbed edgeare the same line)Ribbed edge SQUARE to the fence (Path A · perpendicular)
Same cut, two setups. The cap angle is always the slope; the saw reads from square.

CutsThe 9 cuts

Cuts 1–5 · the cap (peak cap channel)

slopeCAP1slope2slope345°back in445°back in5optionalribbed edgeopen edgerest of the channel→ next peakShown the way it installs: ribbed edge down, point up. Start at the end of the channel so nothing is wasted.cut 3, up closeribs slope back in
Ribbed edge down, the way it installs. Start at the end of the channel.

Cuts 6–9 · the tracks (light track)

the cap (cuts 1–5)Lcenter track · light dead centertop edge = L8½ slopeleft rake stick9½ sloperight rake stick6½ slope7½ slopeEvery track cut: half the slope, long point on top (roof side).
Center track top edge = L, the cap’s ribbed part. Every track cut is half the slope, long point on top.

Path APerpendicular, on the jig

FENCE4×4 JIGpoint1dial = slopePlate hooks the end of the fenceribbed edgetight to the jigopen edge
  1. Jig on the fence. Channel end on the fence, ribbed edge tight to the jig.
  2. Dial the slope. Cut 1.
FENCE · jig removedpoint on the bladecut 1 edge flat on the fence2dial 28°= 90 − 2 × slope, other directionCAPCheck: the point measures 118° (the apex).
  1. Jig off. Cut 1 edge flat on the fence.
  2. Dial 90 − 2 × slope, swung the other way. Blade on the point. Cut 2.
  3. Cuts 3 and 4: 45°, back in. Cut 5 optional. Cuts 6–9: slope ÷ 2.
Flatter than 5/12 (under 22.5°)? Cut 2 needs more than 45°. A 4/12 roof needs 53°. Ask before cutting.

Path BParallel, along the fence

FENCEpoint at the open edge, on the fence side12Cut 1 · dial 40°, swung one wayCut 2 · same 40°, swung the other wayribbed edge toward yourest of the channel → next peakExample, 50° roof: dial 90 − 50 = 40°.
  1. Open edge on the fence, ribbed edge toward you. Start at the end of the channel.
  2. Dial 90 − slope. Cut 1.
  3. Same number, swung the other way. Blade on the point. Cut 2.
  4. Cuts 3 and 4: 45°, back in. Cut 5 optional. Cuts 6–9: slope ÷ 2.

FitFit the peak

the homelevel under the bottom of the cap2 tabs · 1 screw each, straight up into the home
Cap only: two tabs, one screw each straight up into the home. Level under the bottom.
123Lights: center first, then down each side.
Add the center track and rake tracks. Lights: center first, then down each side.
Peak cap with a screw tab at the bottom corner

Screw tab, bottom corner: every peak.

Peak cap with a bracket on each top slope

Bracket on each top slope: bracket installs only. The screw tabs still go on.

Dry fit first. Cap, center track and both rake sticks go up dry. Lights go in only when every joint closes.

OnceBuild the jig

A 4×4 block with a metal plate screwed to one end. The plate hooks the fence edge; the channel’s ribbed edge rests on the block’s other end, so the blade comes up through the top of the ribbed part.

FENCE4×4 JIGblade lineat the fence: the sawpivots herePlate hooks the end of the fenceribbed edgetight to the jigopen edge
  1. Cut a straight 4×4 a little long.
  2. Screw a metal plate to one end so it overhangs and hooks the fence edge.
  3. Measure from the fence edge to where the blade crosses the top of the ribbed part. Cut the block to that length.
  4. Lower the blade (unplugged). Hits the ribs? Shave the block. Gap? Shim the end.
  5. Mark it PEAK JIG · DO NOT CUT.

MoreVideos and the printable guide

Avira Lighting · Village Lighting Co. · Draft, Nov 2026